Please choose your country or region.
United States United States Ok Change
 Cooperation Agreement Signed with Siemens and ThyssenKrupp

Cooperation Agreement Signed with Siemens and ThyssenKrupp

Home Media Stories Cooperation Agreement Signed with Siemens and ThyssenKrupp

Cooperation Agreement Signed with Siemens and ThyssenKrupp

Cooperation provides for the development and marketing of steep-angle conveying systems in opencast mining.

Cooperation Agreement Signed with Siemens and ThyssenKruppContiTech signs a cooperation agreement with Siemens and ThyssenKrupp for the development and marketing of the Chevron Megapipe tubular belt conveying system. F.l.t.r.: Hans-Jürgen Duensing and Dr. Michael Hofmann (ContiTech), Dr. Franz-Maria Wolpers (ThyssenKrupp), Cornelis Rahner and Norbert Becker (Siemens), Detlev Schröder (ThyssenKrupp).
ContiTech Conveyor Belt Group, Siemens AG Process Industries and Drives Division, and ThyssenKrupp Industrial Solutions are concluding a cooperation agreement for the development and marketing of the Chevron Megapipe tubular belt conveying system, setting a milestone for a reduction in conventional heavy-duty traffic in opencast mining. High-strength ribbed pipe belts with an outer diameter of up to 900 mm are available as fabric or steel cord belts. They have low-elongation, high-strength carcasses and will enable the efficient conveying of ores and overburden over mine slopes with angles of inclination of 30 to approx. 50 degrees. The well-known advantages of the MegaPipe are retained, namely closed-trough transport of large mass flows up to 9,500 m3/h and lump sizes up to 350 mm directly from the primary crusher.
Cooperation Agreement Signed with Siemens and ThyssenKruppRibbed Chevron-Megapipe can negotiate steep angles and tight 3D-curves where space is restricted as well as high mass flow rates in opencast and underground mines.

Download